top of page
3D MODULAR BUILDING

Third brief for the module XB2002 was to create a 3D Modular Building on a choice of photograph we were given. 

 

All of the Modular Pieces together (not assembled) were 1697 tris.

 

The brief specified hand painting the texture map, which can be seen below. In total, the modelling took around 7 hours, and the texturing 10 hours.

​

For the module this was submitted as part of I achieved a grade of 74 (First Class)

bottom of page